15000.00 for siding suppose to be done in 4 to 6 weeks took pictures of installer leaving spaces
between insulation called and complained the foreman stated he inspected and it was ok i sent pictures and they stated they would fix the problem. i had numerous complaintes of worker getting angry with neighboris i finally called and had champion keep himm off my property.The manager sent two young men to finish and they stated the installer did leave big areas that was not insulated .I called the main rep from boise he came down to my house with a snoty attitude saying the job was ok i pointed out the spaces youy could push and feel empty he got angry and said ok ill take a thousand off or we will be here for weeks in your way i just wanted them out.