door2doorshop

5 stars
(0)
4 stars
(0)
3 stars
(0)
2 stars
(0)
1 stars
(4)
Category: Automotive

Contact Information
New Zealand

door2doorshop Reviews

pete555 June 11, 2011
Product does not have instructions to operate it
After purchasing a Tacho Universal from "door2doorshop" the item arrived and the instruction manual did not show the instructions on how to connect the item for use.
I emailed "door2doorshop" and they prommised to e mail me the drawing required, that was three weeks ago and I have received nothing, the company now refuses to even answer my e mails and have not responded to my request for a refund.
I am left with $400 worth of rubish that I cannot use and the company does not give a dam.
"door2doorshop" have a very flashy site but the company have no morals or customer service whatsoever. I would recommend visitors to their site to beware and not to buy goods. If you want to be satisfied with your purchases buy from another company who has a customer service ethic, it cost you a little more but you only get what you pay for.
youbo3151 March 7, 2011
pulse oximeter
Now, let’s consider the inefficiencies that this type of lube task planning and scheduling creates. Of the eight-hour workday, how many hours is our tech actually doing value-added work, as opposed to collecting supplies, paperwork or traveling to/from the job sites?

In the maintenance and reliability field, the time spent doing work as opposed to every other aspect of planning, kitting and traveling to the job is called “wrench time”rubber conveyor belts<A href="http://www.rtekinternational.com/rubber-conveyor-belt.html">Conveyor Belting</A>. For many organizations, wrench time barely exceeds 25 to 30 percent, meaning that out of an eight-hour day, only two to 2.5 hours of useful work is actually getting done. Conversely, world-class companies have wrench times in the range <A href="http://www.rtekinternational.com/rubber-conveyor-belt.html">Conveyor belting</A>of 50 to 60 percent. Compared to 25 percent wrench time, a wrench time of 50 percent equates to effectively having twice as many people to do the work required. (This is a concept sometimes referred to as the “hidden staff”power transmission belts.) For most plants, loss of wrench time comes from paperwork, obtaining supplies and travel time to/from the job site.<A href="http://www.rtekinternational.com/rubber-conveyor-belt.html">Conveyor Belt</A>

Now, let’s think about the execution of the lube tasks prescribed for our belt conveyor. The actual time to grease the motor or pillow block bearings, take an oil sample or check<A href="http://www.rtekinternational.com/v-belt.html">Rubber V-belts</A> the timing belts oil level is miniscule compared to the time to obtain the PM worksheets, gather the required tools and walk to the lubrication point in question. For all but the smallest plant, this is always true – the bulk of the time is not spent executing value-added lubrication tasks but in preparing to execute the tasks.

OK, how can we be more efficient in the way we plan, schedule and execute work? The answer is actually very simple: Forget about task frequency! That’s not to say that <A href="http://www.rtekinternational.com/timing-belts.html">Rubber Timing belts</A> we shouldn’t adhere to the optimum periodicity for lubrication PMs, but rather we should not consider the frequency in compiling the block of work to be done in any given work day or week.

This approach, called “dynamic route planning”PU Timing belt, allows for any task that is geographically related or requires the same or similar tool set to be executed<A href="http://www.rtekinternational.com/timing-belts.html">Rubber Timing belt</A> on the same assignment sheet. While this takes some time to establish, deploying dynamic route management really creates far more efficiency in kitting and traveling to the job site.<A href="http://www.thermometermanufacturer.cn">thermowell</A>
<A href="http://www.bagmakingmachinery.net">bag making machine</A>
<A href="http://www.bagmakingmachinery.net">plastic machine</A>


Using this approach for our belt conveyor, we find that, one week, <A href="http://www.rtekinternational.com/v-belt.html">Rubber V-belt</A> the assignment sheet <A href="http://www.shanghaiescort66.com">shanghai escort</A>may simply state: shanghai massage“Check oil level in to the full running mark. If level is too low, top off using oil XYZ, as necessary.” But every fourth week, an additional task appears: “Regrease the pillow block bearings”V-belts. The key here is that the weekly and monthly tasks appear on the same assignment sheet, in the correct sequence, so the two tasks can be executed at the same time. This is far more efficient than walking back to the lube room between tasks.

Once a quarter, our oils sampling tasks also appear, while every six months, a fourth task (grease the electric motor bearings) is included in our dynamic assignment conveyor belting sheet, so this can be done at the same time as checking the oil level, greasing the pillow block bearings and taking the oil sample.

Time Well Spent
Using this simple example, it should be apparent that dynamic route planning offers a very significant advantage over our conventional approach of frequency-based lube routes. Instead of walking to and from the lube room, locating and gathering different tools, and handling paperwork Standard sphygmomanometer <A href="http://www.door2doorshop.com">pulse oximeter</A>before executing the work, dynamic route planning allows those tasks that logically fit together to be done at the same time, no matter what their prescribed frequency.

So, next time you look at how you execute routine time-based PM work, think about where most of the time is spent: Is it in actually doing valued-added work shanghai escort, or are you spending most of your days preparing to do work?
youbo2 July 14, 2010
ultrasound machine
A new desktop mercury sphygmomanometer, blood pressure is based on the original desktop, retain the basic structure, principles ds1052e and use the same test under the premise of improvement made. The original desktop mercury sphygmomanometer gauge line from far, measurements, to stop the beating eyes fell on the point of mercury, but also take into account the pause point scale corresponding to the lines, <A href="http://www.door2doorshop.com">ultrasound machine</A> the ear should pay attention to the voice of a stethoscope, as people's reactions are different levels of capacity and operation, the measured values also vary. The new type of blood pressure to millimeters of mercury gauge (5) and Kpa Hg gauge (6) set near the Hg (4) of the edge, the measurement, the eyes can also beat the mercury fell pause point and scale online played measurement is convenient, intuitive, accurate and objective.Indirect measurement instruments have mercury <A href="http://www.door2doorshop.com">oximeter</A>sphygmomanometer, random zero sphygmomanometer, blood pressure spring tables, automatic electronic blood pressure monitors, blood pressure measuring intermittent long time, skin small artery blood pressure measurement gages. thermowell These blood pressure monitors are designed according to different needs, such as random zero blood pressure is to overcome the visual and other human error and more accurately study changes in blood pressure when the application; intermittent<A href="http://www.rigoloszilloskope.com/ds1052e-oszilloskop.html">oszilloskop</A>
<A href="http://www.rigoloszilloskope.com/ds1052e-oszilloskop.html">ds1052e</A>
-type blood pressure measuring time is used for a continuous 24-hour monitoring of blood pressure change; skin small artery blood pressure determination account for the child, babies, Pressure Gauge Manufacturer newborn and design; <A href="http://www.rigoloszilloskope.com/ds1052e-oszilloskop.html">oszilloskop</A>as intelligent, electronic blood pressure monitor automatically inflated within the inflatable cuff blood pressure readings and display. Electronic blood pressure monitor finger just a finger wear on the finger, you can automatically measure blood pressure, more convenient. Note that these automatic electronic sphygmomanometer <A href="http://www.thermometermanufacturer.cn/html/en/pressure_gauge_thermometer.html">Pressure Gauge Manufacturer</A> measured blood pressure value may be measured with the Mercury blood pressure values of a certain difference, should check in advance, and remember the difference.
youbo2 July 14, 2010
ultrasound machine
In recent years, according to the International Organization of Legal Metrology international recommendations, "the draft amendments to the provisions of blood pressure"oximeter scale change mm Hg blood pressure (mmHg) for the dry Pa (kPa). 1kPa = 7.5mmHg, ruler of the division value is 0.5kPa. Currently there are two kinds of blood pressure table scale, application note.

Table-type blood pressure monitor to enable the spring before<A href="http://www.thermometermanufacturer.cn/html/en/thermowell.html">thermowell</A> you for inspection. Normal blood pressure can be used in the table usually dial pointer shall mean zero, pressure, the reaction flexible, and able to return to the original zero.

If in doubt the accuracy of blood pressure when the table can be used a mercury sphygmomanometer or blood pressure accurately check the table together. ultrasound machine Stethoscope <A href="http://www.door2doorshop.com">oximeter</A> on their way to "Y"-shaped tube removed, the ends were then accurate blood pressure monitor (sphygmomanometer) and the calibration of the spring form blood pressure table, the third terminator, and valve arm band, so using the same pressure, observed to check the blood pressure tables with accurate blood pressure monitor (sphygmomanometer) of the reading is <A href="http://www.door2doorshop.com">ultrasound machine</A> Celosia argentea server, such as different blood pressure is illustrated in the calibration table is not accurate, such as reading the same, only when zero biased, oszilloskop and does not affect the actual use. Blood pressure can not be found to restore the table pointer zero position, not to arbitrarily adjust<A href="http://www.rigoloszilloskope.com/ds1052e-oszilloskop.html">oszilloskop</A> screw, so as not to damage the table movement, then blood pressure should be sent to the manufacturer or a designated table service department repairs.

Write a Review for door2doorshop

Rate it!
Review Title
You Review
Image
Type the numbers shown

RECENTLY UPDATED REVIEWS

permanently closed
Taxi To Heathrow & Heathrow Taxi Transfers
Chapter 7 Bankruptcy
Ride and Shine Detail
old ironsides fake id
Digital Marketing and Company Formation Services UAE | SEO and PPC Marketing
Escort ladyluck Frankfurt
Bulk SMS Gateway in UAE | Best Bulk SMS Service In UAE

REQUESTED REVIEWS

REVIEWS BY CATEGORY