Eastern Power Distribution Company of Andhra Pradesh

5 stars
(0)
4 stars
(0)
3 stars
(0)
2 stars
(0)
1 stars
(1)
Category: Services

Contact Information
India

apeasternpower.com

Eastern Power Distribution Company of Andhra Pradesh Reviews

August 26, 2010
INSTANTANEOUSLY LOW VOLTAGE IN METER NO: 198601/ POLE NO:42 B 1/4, MARRIPALEM OLD POLICE STATION TRANSFORMER NO:9752SINCE FIVE MONTHS
INSTANTANEOUSLY LOW VOLTAGE IN METER NO: 198601/ POLE NO:42 B 1/4, MARRIPALEM OLD POLICE STATION TRANSFORMER NO:9752SINCE FIVE MONTHS

All the power distribution under the transformer no: 9752(Marripalem Old police Station) rating of transformer is 160 KVA it has written in white paint. My node(Meter No:198601)connected pole is 42B 1/4

I am facing consistently low power of 100 V from1830 to 2300 hrs every day(05 hours)consistently since 5 moths. Due to date I could not switch on my PCs(online publisher & trading PC).

No authority is attending or rectifying the fault even after frequently reported by the huge number of consumers since five months..
Consumer rights are assassinate by Central Power Distribution Company Andhra Pradesh.

My obligation is that why only always the consumers suffer for the disability in service by the companies? Is there not any consumer right to be enforced to follow by the said companies? Why the company is exempted every time by the government. It says that Government for the people by the people of the people but this incident reveal it. In this way it smell the conspiracy of exploitation & extortion our democracy and gradually converting the system to autocracy, hence the open exploitation is persisting in providing the power supply to consumers and thus fundamental right are nabbed by the companies around the nation.

Probable faults are :

1 Low capacity transformer is fitted as per increased consumers in the area the required load in the area (Old police station transformer NO: 9752).

2. Number of consumers load increased but transformer is not being upgraded in phase in single line or department denying the replacement.

3. Transfer may be worn out to provide the sufficient wattage as per rated 160 KVA due to consuming of complete running hour which has manufactured for.

4. The phase connected with me may be beyond the consumers’ loads permitted by the single phase.

5. May be the three phases capacity of the loads has not been distributed equally.

I draw you kind attention to repair the same and facilitate the same to consumer as you suppose to provide as per policy laid down by you and hope you will protect the consumer rights to ensure the same against my humble request. The same copy will be forwarded to online consumer court if the necessary measures are not being taken in scheduled periods. Now my system is beeping because of low power. I need your co-operation in this regards.

Write a Review for Eastern Power Distribution Company of Andhra Pradesh

Rate it!
Review Title
You Review
Image
Type the numbers shown

RECENTLY UPDATED REVIEWS

permanently closed
Taxi To Heathrow & Heathrow Taxi Transfers
Chapter 7 Bankruptcy
Ride and Shine Detail
old ironsides fake id
Digital Marketing and Company Formation Services UAE | SEO and PPC Marketing
Escort ladyluck Frankfurt
Bulk SMS Gateway in UAE | Best Bulk SMS Service In UAE

REQUESTED REVIEWS

REVIEWS BY CATEGORY