my name is angelo pilla i signed a crontract to biuld with formula homes 1n june 2008 . Im still waiting for
handover.During this whole nightmare i have had nothing but grief and dissapointment in watching my home being constructed where do i start firstly my home was being biult from the inside out, my brick work is sitting 50mm off the slab, all my timber flooring have been damaged upstairs, wall tiles have been damaged, kitchen cupboards under sink are cracked and damaged hindges are bent exstream water damage hard wood timber staircase is damaged, all workmanship is at a very poor state.I have a wife and 3 children and we are at the point of living in the street .After several letters and phone calls we still get the run around we were promissed handover by ravi crishnan that was in late september 2009 he assured me that i would be in my housr by november ravi is the managing director (owner).There have been several site supervisors and opperation managers i have delt with in the past 2 years who are no longer employed at formula homes i have taken upon my self to take this matter further im at point where i have nothing to lose if anyone has intentions of biulding with this company i highly recomend you seek other builders and if that doesnt convince you im happy to take you to my home and show you first hand how the quality of there homes are .if there is any one out there who has delt with a simmiular nightmare like mine please contact me i need as much help as i can get