the concrete foundation was poured 5/8"to an 1" out of plumb. i showed up
at the job site before the foundation was poured and noticed the bow in the
forms of the concrete wall pointed it out to the men working there and they assured me they would brace it straight. it was poured with bow in the wall
anyway. they also crushed the drain tile around the footings which i had to fix myself.
this companys shop is located in box elder, sd. area. would not use this company again.